With the metal structure of the South Addition now finished, construction of the interior of the space has begun! This an exciting time in the construction project where change happens quickly. This week the concrete on the second level was poured and the shape of the new floors is being formed.
Site of the Terrace and Beit Midrash.
Beginnings of the grand stairway that will lead from the ground level lobby up to the second floor.